Project Overview
Project Name: FEWA (Federation of Employers and Workers of America) Office Addition
Location: Bay City, Texas, USA
Project Type: Office Building Addition
Project Duration: 1.5 Months
eLogicTech provided comprehensive Building Information Modeling (BIM) services to support the schematic design and construction documentation phases of the FEWA office addition project. The engagement focused on developing coordinated 3D models, aligning existing and proposed conditions, and producing construction-ready documentation to support efficient project execution.
Client Challenge
Office addition projects demand precise integration between existing structures and new construction while maintaining documentation accuracy for approvals and execution.
Key project challenges included:
- Aligning as-built drawings with new schematic design intent
- Coordinating existing and proposed building conditions within a single BIM environment
- Preventing documentation inconsistencies between model and construction drawings
- Delivering construction-ready documentation within a compressed schedule
The client required a dependable BIM partner to ensure coordinated modeling and reliable construction documentation while minimizing design conflicts and execution delays.
Scope of Services
eLogicTech delivered end-to-end BIM support from schematic design through construction documentation.
Core Services Included:
- Existing and proposed conditions modeling
- BIM-based design coordination
- Development of coordinated 3D Revit model
- Preparation of complete Construction Documentation (CD Set)
- Integration of as-built information into final documentation
Technologies & Platforms
- Autodesk Revit
- BIM 360
- AutoCAD
- Bluebeam
BIM Execution & Coordination Approach
A structured BIM workflow ensured alignment between client inputs and construction deliverables.
Existing Conditions Integration
- Incorporated client-provided as-built drawings into BIM environment
- Updated discrepancies between legacy documentation and site conditions
- Developed accurate base model for design integration
Design Coordination
- Integrated schematic PDF designs into coordinated BIM model
- Maintained consistency between model geometry and drawing outputs
- Ensured constructability through disciplined documentation workflows
Construction Documentation Readiness
- Developed permit-ready and construction-ready drawing sets
- Delivered synchronized PDF and DWG documentation
- Maintained model-to-drawing integrity to reduce revision cycles
Deliverables
- Fully coordinated Revit BIM model
- Construction Documentation Set (PDF & DWG formats)
- Updated As-Built Conditions Documentation
- Integrated Existing & Proposed Conditions Model
Key Challenges & Solutions
Challenge: Aligning legacy as-built data with new schematic additions
Solution: Developed an accurate base BIM model incorporating existing conditions and validated geometry for integration
Challenge: Maintaining documentation consistency across model and drawings
Solution: Established model-driven documentation workflows ensuring synchronized outputs
Challenge: Delivering coordinated documentation within tight timelines
Solution: Single-point leadership model enabling streamlined decision-making and rapid iteration cycles
Measurable Outcomes & Client Benefits
- Improved coordination between existing and new building components
- Reduced risk of documentation discrepancies during construction
- Faster documentation turnaround supporting project timelines
- Enhanced construction readiness through model-driven documentation
Client Testimonial
“eLogicTech demonstrated strong BIM expertise and delivered coordinated construction documentation aligned with our project requirements. Their structured modeling approach and responsiveness supported smooth project execution.”