Fast-Track MEP & BIM Coordination for a Modern Fitness Center
Project Overview
Client: Recreational Facility Developer – Georgia, USA
Project Type: Fitness Center – Gym and Wellness Facility
Project Size: 69,737 sq. ft.
Duration: 1 Week
When a leading fitness brand in Georgia planned its state-of-the-art wellness center, they turned to eLogicTech for fast-track MEP design and BIM coordination services. The project required a sustainable HVAC design and an energy-efficient electrical system—delivered under a tight one-week deadline.
Why Did the Client Choose eLogicTech Solutions?
eLogicTech Solutions was selected for its:
- Proven expertise in fast-track MEP design and BIM coordination services.
- Ability to deliver construction-ready MEP solutions within tight schedules.
- Track record of supporting fitness and wellness facility projects with precision and efficiency.
Our Scope of Work
eLogicTech provided end-to-end MEP engineering solutions, including:
- HVAC heat load calculations with energy-efficient equipment selection
- Energy modeling solutions using Trace 3D to optimize system performance
- 3D HVAC and electrical modeling in Revit for clash-free coordination
- Electrical load calculations and power distribution design
- Delivery of a MEP-coordinated construction drawing package ready for execution
Project Snapshot
- Project Name: Modern Fitness Center MEP Design
- Location: Georgia, USA
- Type: Fitness Center – Gym and Wellness Facility
- Project Duration: 1 Week
- Team Composition: 1 Mechanical Engineer, 1 Electrical Engineer
Unique Challenges We Faced
- Compressed timeline: Deliver a full MEP package in 1 week
- High-performance HVAC system requirements for large occupancy and exercise-driven heat loads
- Tight spatial planning to integrate HVAC ducts and electrical layouts seamlessly
How We Delivered Effective Solutions
- Applied Trace 3D energy modeling for quick simulations, ensuring sustainable HVAC design with optimized efficiency.
- Used 3D BIM coordination in Revit to detect and resolve clashes before construction.
- Streamlined mechanical and electrical design collaboration, reducing turnaround time and eliminating rework.
Our Process Approach That eLogicTech's Team Followed
With just 1 mechanical engineer and 1 electrical engineer, our team leveraged BIM-driven workflows to accelerate delivery without compromising quality.
Requirement Assessment: Engaged with client stakeholders to understand fitness facility requirements and energy efficiency goals. We received project specifications with particular focus on high-occupancy and exercise-driven loads.
Energy Modeling & Design: Applied Trace 3D energy modeling for quick simulations and created detailed 3D MEP models in Revit. Our technical team optimized HVAC and electrical systems for fitness center requirements.
BIM Coordination & Clash Detection: Used 3D BIM coordination in Revit to detect and resolve clashes before construction. Our engineering team developed comprehensive coordination models with integrated MEP systems.
Drawing Package Development: Streamlined mechanical and electrical design collaboration to produce construction documents. The client approved the MEP package, and our team performed quality reviews before final submission.
Quality Assurance & Delivery: Conducted internal reviews to ensure compliance with energy efficiency and fitness facility standards. We delivered the complete MEP-coordinated construction drawing package within the committed one-week timeline.
Delivering Results with Measurable Outcomes
- Energy-efficient HVAC system design tailored for a high-occupancy fitness environment
- Fully coordinated MEP drawing package delivered in just 1 week
- Construction-ready BIM models with minimal design revisions
- Enhanced sustainability and reduced energy costs through optimized system selection
Client Impact & Feedback
The client commended eLogicTech for: "Delivering a fully coordinated MEP package within an extremely tight timeframe while ensuring high-quality, energy-efficient solutions for our fitness center project."
Why eLogicTech?
At eLogicTech, we specialize in fast-track MEP design and BIM coordination services that empower developers, architects, and contractors to:
- Accelerate project timelines with rapid delivery
- Reduce risks through 3D clash detection and BIM integration
- Enhance sustainability with energy modeling solutions
- Improve long-term efficiency with sustainable HVAC and electrical designs
Ready to Fast-Track Your MEP Project with BIM Coordination and Energy-Optimized Design Solutions?
Looking to fast-track your MEP project with BIM coordination and energy-optimized design solutions? Contact eLogicTech today and let our experts deliver construction-ready, sustainable MEP solutions tailored to your project needs.
Need Help?
Don't hesitate to contact us for more information about company or service