Project Overview

The client required a fully coordinated HVAC and Plumbing (PHE) design solution for a warehouse office building supporting order processing, documentation management, and daily administrative operations.
The facility included offices, multipurpose rooms, reception areas, storage zones, and record rooms, each demanding tailored zoning, accurate load calculations, and seamless integration with evolving architectural layouts.
eLogicTech was engaged as a virtual MEP design partner, responsible for delivering high - quality construction - ready documentation within a compressed timeline.

The Challenge

This project presented several execution risks commonly faced by growing US commercial developments:

  • Frequent architectural revisions triggered repeated MEP rework
  • Incomplete design information during early project stages
  • Late - stage equipment finalization, impacting coordination and schedules

Without a flexible and responsive MEP team, these challenges could have resulted in:

  • Documentation delays
  • Coordination errors
  • Increased construction - phase RFIs

eLogicTech’s Strategic Approach

Rather than reacting to changes, eLogicTech implemented a proactive, fast - turnaround delivery model designed for dynamic project environments.

  • Rapid revision cycles aligned with architectural updates
  • Overtime resource allocation to recover lost schedule time
  • Continuous coordination to bridge information gaps
  • Flexible engineering deployment to accommodate late equipment decisions

This ensured progress continued without compromising accuracy or code compliance.

Technical Execution

HVAC Design & Heat Load Analysis

  • Developed complete HVAC system layouts compliant with applicable US standards
  • Created intelligent zoning based on room function and occupancy
  • Performed duct sizing for office, admin, and storage areas
  • Conducted detailed heat load calculations using TRACE 700
  • Selected HVAC equipment optimized for efficiency, reliability, and maintainability

Plumbing & Public Health Engineering (PHE)

  • Designed domestic water supply, drainage, and sanitary systems
  • Prepared plumbing layouts for restrooms, pantry, and utility areas
  • Developed riser diagrams, pipe sizing calculations, and fixture schedules
  • Ensured full compliance with local plumbing codes

Results & Business Impact

  • Delivered construction - ready HVAC & PHE drawings within 3 weeks
  • Maintained coordination accuracy despite multiple design changes
  • Reduced risk of site conflicts and RFIs during construction
  • Enabled the client to meet internal deadlines without expanding in - house teams

Why This Matters to US AEC Firms

This project demonstrates how eLogicTech helps mid - size AEC firms and commercial developers:

  • Absorb design changes without schedule disruption
  • Scale MEP production quickly without hiring risk
  • Maintain code compliance and documentation quality
  • Keep projects moving even under compressed timelines

eLogicTech Value Delivered

eLogicTech functioned as an extension of the client’s MEP department, offering:

  • Fast, scalable HVAC & PHE production
  • High - accuracy, code - compliant documentation
  • Reduced coordination stress for internal teams
  • Predictable delivery under changing project conditions