→

All Our Services

Retail Plaza MEP Design & Documentation

Project Challenge

Retail developments demand fast - track delivery, tenant flexibility, and code - compliant MEP coordination - often under tight staffing and documentation timelines.

For Parkside Plaza, the client required:

  • Complete MEP Design Development (DD) and Construction Documents (CD)
  • Seamless coordination with architectural and structural drawings
  • Retail - ready systems that could adapt to multiple tenant configurations
  • Full compliance with North Carolina and US building codes

All deliverables had to be produced within an aggressive 3 - week schedule, without compromising documentation quality or coordination accuracy.

Business Impact

Without a dedicated MEP production partner:

  • In - house teams risked schedule overruns
  • Incomplete coordination could lead to field rework
  • Delays in CD delivery could stall permitting and construction starts

The client needed an extension of their internal team - not a vendor - to execute MEP documentation efficiently and accurately.

eLogicTech Solution

eLogicTech acted as a virtual MEP production team, delivering coordinated DD and CD sets across all disciplines.

Scope of Services Delivered:

Mechanical (HVAC)

  • Retail - optimized HVAC layouts
  • Equipment sizing and zoning based on tenant loads
  • Duct routing coordinated with ceilings and structure

Electrical

  • Power and lighting layouts for tenant spaces and common areas
  • Emergency and exit lighting design
  • Panel schedules, load calculations, and circuiting
  • Coordination with HVAC electrical requirements

Plumbing

  • Domestic water and sanitary piping layouts
  • Code-compliant fixture planning for retail occupancy
  • Clash-free routing aligned with architectural and structural systems

Execution Model

  • Dedicated 3 - member MEP team
  • High - collaboration workflow with the client
  • DD and CD sets delivered concurrently to compress timelines
  • On - time project delivery despite aggressive timelines

Project Outcome

  • 100% coordinated MEP DD & CD sets delivered in 3 weeks
  • Retail - ready MEP systems supporting flexible tenant planning
  • Reduced coordination risk during construction
  • Enabled smooth permitting and downstream execution

This project reinforced eLogicTech’s role as a risk - reduction partner for US retail developments - delivering speed, accuracy, and scalability without the cost or risk of in - house hiring.

Why This Matters for Retail Projects

For small and mid - size US AEC firms, eLogicTech provides:

  • On - demand MEP production capacity
  • QA / QC - driven documentation
  • Faster delivery without staffing expansion
  • Reliable coordination for tenant - driven retail projects

Explore how eLogicTech can support your retail MEP documentation:

https://www.elogictech.com

Need Help?

Don't hesitate to contact us for more information about company or service