Preparation of DD + CD. A team of 4 persons worked from client office for almost 18 months. Converted the schematic design drawings to Construction documentation. Designed and developed details of 50 staircases. Designed and developed the exterior façade elements, along with maintenance and cleaning system. Co-ordination with Structural, Mechanical and Electrical departments.
Designed and developed RCP’s, Floor Finish Plans, Interior Elevations (for Galleries, etc), enlarged floor plans and details.
Developed the Faculty club, in between both the campuses, with amenities like gym, games room etc.
Project Scope and Description:
Location: Washington, USA
Type: Healthcare, Hospital
Area: 37705 sq. ft
Work: 120 man-hours, 3 story structure.