6 story structure, CD set (1.5 years, 4 member team), Preparation of DD + CD. A team of 4 persons worked from client office for almost 18 months. Converted the schematic design drawings to Construction documentation. Designed and developed details of 40 staircases and 15 elevators. Designed and developed the exterior façade elements, along with maintenance and cleaning system. Co-ordination with Structural, Mechanical and Electrical departments. Designed and developed RCP’s, Floor Finish Plans, Interior Elevations (for Galleries, etc), enlarged floor plans and details. Developed the Faculty club, in between both the campuses, with amenities like gym, games room etc.
Co-ordination with other departments, by accepting some changes and suggesting more, keeping the design unchanged. Planning the tasks ahead and achieving them before the submission dates. Our team worked in developing drawings from DD to CD stage in AutoCAD. eLogicTech team visited the site (Kuwait) to work on this project for eighteen months. This college has different campus for boys and girls and a beautiful faculty club in between both these campus, with all the amenities like games room, gym etc.
Project Scope and Description:
Type: Educational, Campus building
Area: 98729 sq. ft
Work: 10500 manhours
Need Help?
Don't hesitate to contact us for more information about company or service