
{"id":4316,"date":"2026-10-06T10:24:26","date_gmt":"2026-10-06T10:24:26","guid":{"rendered":"https:\/\/www.elogictech.com\/blog\/?p=4316"},"modified":"2026-10-14T10:40:22","modified_gmt":"2026-10-14T10:40:22","slug":"building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review","status":"publish","type":"post","link":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/","title":{"rendered":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"4316\" class=\"elementor elementor-4316\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8f57359 e-flex e-con-boxed e-con e-parent\" data-id=\"8f57359\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-18fbc48 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"18fbc48\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Introduction<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-586ed28 e-flex e-con-boxed e-con e-parent\" data-id=\"586ed28\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5f33568 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"5f33568\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The COMcheck report is usually the last document built in a commercial permit set, and it is often built by the person who has spent the least time with the drawings. Then a plan reviewer sits down with the report on one side and your wall sections, window schedule, and roof plan on the other. Every number that doesn&#8217;t match a drawing becomes a line in the comment letter.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4d7d960 e-flex e-con-boxed e-con e-parent\" data-id=\"4d7d960\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-219443c sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"219443c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>None of that is a software problem. It is a coordination problem between architecture and MEP, and it starts months before anyone opens COMcheck.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1c17bc9 e-flex e-con-boxed e-con e-parent\" data-id=\"1c17bc9\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-40f7e8c sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"40f7e8c\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Executive Summary \/ Key Takeaways<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-637f9ef e-flex e-con-boxed e-con e-parent\" data-id=\"637f9ef\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-feedbf1 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"feedbf1\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Envelope data lives in at least four places: the model, the specifications, the window and door schedules, and the COMcheck file. When they drift apart, plan review is where it shows up.<\/li><li>Plan reviewers cross-check COMcheck entries against plan sections, schedules, and site orientation. Some jurisdictions now reject incomplete reports before review even starts.<\/li><li>The coordination gap is rarely in the architect&#8217;s or the engineer&#8217;s work alone. It sits between them: load calcs and energy models built on envelope values the architect has since changed.<\/li><li>Energy code adoption is moving unevenly toward the 2024 IECC and ASHRAE 90.1-2022, so the same team may be working to different editions on different projects in the same year.<\/li><li>The fix is procedural: one envelope data source, COMcheck started at DD, re-run on every change, and checked against the reviewer&#8217;s own checklist before submittal.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6ebea4e e-flex e-con-boxed e-con e-parent\" data-id=\"6ebea4e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-787ae9b sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"787ae9b\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Industry Overview <\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e4bf79e e-flex e-con-boxed e-con e-parent\" data-id=\"e4bf79e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0212f12 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"0212f12\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The U.S. Department of Energy issued its affirmative determination on ASHRAE Standard 90.1-2022 on March 6, 2024, and set March 6, 2026 as the deadline for states to certify. That date has passed, and adoption is still uneven. DOE&#8217;s state profiles show some states, including Delaware, Nevada, and Illinois (with amendments), on the 2024 IECC and ASHRAE 90.1-2022 for commercial work, while others remain on earlier editions. Delaware amended its regulations to adopt both in April 2026, and Sussex County will require plans submitted after December 31, 2026 to be designed to the 2024 IECC with a COMcheck or REScheck worksheet.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ad8d7e9 e-flex e-con-boxed e-con e-parent\" data-id=\"ad8d7e9\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-66f55d3 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"66f55d3\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Enforcement is tightening in places too. Houston&#8217;s permitting office has required a COMcheck report on commercial plan reviews since 2016, and began rejecting incomplete reports at pre-screen in 2021. For a design team, that means the envelope narrative has to be complete and consistent on day one of submittal, not corrected during review.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-be43713 e-flex e-con-boxed e-con e-parent\" data-id=\"be43713\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-810673d sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"810673d\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Problem Statement <\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-aff4e32 e-flex e-con-boxed e-con e-parent\" data-id=\"aff4e32\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b0816ca sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"b0816ca\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Envelope compliance depends on facts that are owned by different people. The architect owns assemblies, insulation, glazing, and air barrier strategy. The MEP engineer owns the load calculations and often the energy model, both of which depend on those same assumptions. The COMcheck file sits in between, and whoever builds it is translating from drawings that may already be out of date.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2c7ea34 e-flex e-con-boxed e-con e-parent\" data-id=\"2c7ea34\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0984b72 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"0984b72\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What a rejected envelope submittal actually costs<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-50aa671 e-flex e-con-boxed e-con e-parent\" data-id=\"50aa671\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c732d08 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"c732d08\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>eLogicTech does not have a benchmark for rejection cost and we won&#8217;t invent one. The cost chain is easy to describe, though, and every project team can price it with their own rates:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b247068 e-flex e-con-boxed e-con e-parent\" data-id=\"b247068\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0c6f091 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"0c6f091\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>A comment letter that cites mismatches between the COMcheck report and the drawings.<\/li><li>Rework hours across sheets, schedules, and the compliance file, usually by senior staff who were already on the next project.<\/li><li>Re-coordination with the glazing supplier, the mechanical engineer, or both, if a value changes.<\/li><li>A resubmission cycle, with the review time and, depending on the jurisdiction, any resubmission fees that come with it.<\/li><li>Schedule delay carried against the project: general conditions, financing, and the tenant or owner date.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-dc2376c e-flex e-con-boxed e-con e-parent\" data-id=\"dc2376c\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bba5262 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"bba5262\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>A simple way to put a number on it internally: rework hours multiplied by blended rate, plus weeks of delay multiplied by weekly project carrying cost, plus resubmission fees. Use your own figures.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-45bbcfe sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"45bbcfe\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Challenges<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d6d21cc e-flex e-con-boxed e-con e-parent\" data-id=\"d6d21cc\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1d2dabf sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"1d2dabf\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>COMcheck started too late. When the file is built at the end of CDs, areas get re-keyed from PDFs and assumptions get filled in to finish the report.<\/li><li>Area takeoff errors. Gross wall area, net opaque wall, glazing, and roof or skylight areas must be consistent with the drawings. Small counting differences are enough for a reviewer to question the whole sheet.<\/li><li>Cavity versus continuous insulation. DOE&#8217;s own training material stresses that the two are entered differently, and that the software interprets them differently. Entered wrong, the report no longer matches the wall section.<\/li><li>Glazing values that moved. U-factor and SHGC on the schedule, the approved submittal, and the report must agree, and value engineering swaps are the usual cause of disagreement.<\/li><li>Air barrier continuity. Reviewers look for a continuous air barrier shown at windows, doors, and transitions. If it isn&#8217;t drawn, it can&#8217;t be verified.<\/li><li>MEP working from stale envelope values. Load calcs and energy models sized on earlier glazing or assembly assumptions will not match the envelope that goes to permit.<\/li><li>Code edition drift. A project designed to one edition and permitted under another creates rework that has nothing to do with design quality.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d5792fb e-flex e-con-boxed e-con e-parent\" data-id=\"d5792fb\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3864782 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"3864782\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Solutions<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-eaaaaa1 e-flex e-con-boxed e-con e-parent\" data-id=\"eaaaaa1\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9cf67d5 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"9cf67d5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Treat the envelope as a managed dataset, not a drawing byproduct. One register of assemblies and glazing, owned by the architect, read by the MEP team, and used to build COMcheck. Every change goes through that register, and every change triggers a re-run.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a22944a e-flex e-con-boxed e-con e-parent\" data-id=\"a22944a\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-197be76 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"197be76\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step-by-Step Process \/ Methodology<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-76d2ceb e-flex e-con-boxed e-con e-parent\" data-id=\"76d2ceb\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-99b6f3f sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"99b6f3f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Confirm the code edition and compliance path with the jurisdiction at schematic design, including whether COMcheck or a performance path applies.<\/li><li>Define each envelope assembly in the model with its R-values, U-factors, and SHGC as parameters, so schedules and takeoffs can be extracted rather than re-measured.<\/li><li>Extract areas from the model: gross wall, glazing by orientation, roof, skylights, slab edge, and below-grade walls.<\/li><li>Build COMcheck at design development and record the plan sheet or detail where each assembly is shown.<\/li><li>Issue the same envelope values to the MEP team for load calculations and energy modeling, and require sign-off that they used them.<\/li><li>Before submittal, trace every COMcheck line to a wall section, window schedule, or specification, using the jurisdiction&#8217;s own plan review checklist as the test.<\/li><li>Re-run COMcheck after any glazing, insulation, or assembly change, and freeze the file when the permit set is issued.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-392f165 e-flex e-con-boxed e-con e-parent\" data-id=\"392f165\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-64f1acd sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"64f1acd\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Benefits<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-7897050 e-flex e-con-boxed e-con e-parent\" data-id=\"7897050\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-35b228c sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"35b228c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Fewer comments tied to mismatches between the report and the drawings.<\/li><li>MEP load calculations that reflect the envelope that is actually being built.<\/li><li>Faster internal QC, because every compliance line has a drawing reference.<\/li><li>Change decisions made with compliance visible, rather than discovered after the fact.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cc74fc2 e-flex e-con-boxed e-con e-parent\" data-id=\"cc74fc2\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-840e72e sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"840e72e\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Features \/ Key Highlights<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-7861693 e-flex e-con-boxed e-con e-parent\" data-id=\"7861693\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b0735ba sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"b0735ba\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>eLogicTech works as the production team behind architecture and MEP firms, so the envelope and the systems that depend on it are produced from the same coordinated model:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2acba1b e-flex e-con-boxed e-con e-parent\" data-id=\"2acba1b\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f6b650d sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"f6b650d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Architectural BIM modeling in Revit up to LOD 400, with envelope assemblies built as data-carrying types<\/li><li>MEP BIM modeling, load calculations, and energy modeling aligned to the architectural envelope<\/li><li>Permit drawings and construction documentation with wall sections, schedules, and air barrier details cross-referenced<\/li><li>BIM model auditing to catch inconsistencies between model data and documentation before submittal<\/li><li>Structured QA\/QC review before any package leaves our team<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-81a6df8 e-flex e-con-boxed e-con e-parent\" data-id=\"81a6df8\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2839d56 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"2839d56\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Best Practices<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6d93620 e-flex e-con-boxed e-con e-parent\" data-id=\"6d93620\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bebc8aa sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"bebc8aa\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Ask the jurisdiction for its COMcheck plan review checklist at the start of the project and design to it.<\/li><li>Put the assembly register in the project&#8217;s coordination plan, with a named owner.<\/li><li>Add U-factor and SHGC to the window schedule and keep them there, instead of in a side spreadsheet.<\/li><li>Require the MEP engineer to state which envelope version their load calcs used.<\/li><li>Re-run COMcheck at each milestone issue, not only before permit.<\/li><li>Keep a short change log for any glazing, insulation, or wall type change after DD.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4c68339 e-flex e-con-boxed e-con e-parent\" data-id=\"4c68339\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a6b2a2d sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"a6b2a2d\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Common Mistakes to Avoid<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-411e6a0 e-flex e-con-boxed e-con e-parent\" data-id=\"411e6a0\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c9f3957 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"c9f3957\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Starting COMcheck after the drawings are &#8220;done&#8221;.<\/li><li>Using a placeholder window product in the report and never replacing it.<\/li><li>Letting value engineering change glazing or insulation without touching the compliance file.<\/li><li>Entering continuous insulation as cavity insulation, or the reverse.<\/li><li>Leaving orientation on the report inconsistent with the site plan.<\/li><li>Assuming the engineer&#8217;s energy model and the architect&#8217;s report use the same envelope.<\/li><li>Submitting a report with blank or generic product fields in jurisdictions that screen for completeness.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cc9d077 e-flex e-con-boxed e-con e-parent\" data-id=\"cc9d077\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-44fea30 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"44fea30\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Comparison Table: Late Workflow vs. Model-Coordinated Workflow<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bd81aa1 e-flex e-con-boxed e-con e-parent\" data-id=\"bd81aa1\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-377ae08 sc_fly_static elementor-widget elementor-widget-image\" data-id=\"377ae08\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"421\" src=\"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-1024x421.png\" class=\"attachment-large size-large wp-image-4325\" alt=\"\" srcset=\"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-1024x421.png 1024w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-300x123.png 300w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-768x316.png 768w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-1536x631.png 1536w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-370x152.png 370w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows-760x312.png 760w, https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/Late-vs.-Model-Coordinated-Workflows.png 1956w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-781db11 e-flex e-con-boxed e-con e-parent\" data-id=\"781db11\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7195098 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"7195098\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Statistics & Industry Data<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2330443 e-flex e-con-boxed e-con e-parent\" data-id=\"2330443\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-035830b sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"035830b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>DOE issued its determination on ASHRAE 90.1-2022 on March 6, 2024, with a state certification deadline of March 6, 2026 (U.S. Department of Energy, Building Energy Codes Program).<\/li><li>DOE&#8217;s analysis found new commercial buildings meeting 90.1-2022 would average 9.8% site energy savings compared with the 2019 standard (as reported by ENR, March 2024).<\/li><li>The 2024 IECC is expected to improve commercial building efficiency by roughly 10% compared with the 2021 edition (Insulation Outlook, 2024).<\/li><li>Houston&#8217;s permitting office has required COMcheck on commercial plan reviews since 2016 and announced rejection of incomplete reports at pre-screen beginning in 2021 (Houston Permitting Center).<\/li><li>Delaware adopted the 2024 IECC and ASHRAE 90.1-2022 for commercial and high-rise residential buildings in April 2026; Sussex County requires compliance for plans submitted after December 31, 2026 (ICC-NTA, June 2026).<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2cdf74d e-flex e-con-boxed e-con e-parent\" data-id=\"2cdf74d\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a8af8c4 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"a8af8c4\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Case Study<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0fc437c e-flex e-con-boxed e-con e-parent\" data-id=\"0fc437c\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ff2eef0 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"ff2eef0\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Consider an AEC firm in Texas designing a three-story medical office building. The team prepared its COMcheck report at the end of construction documents, using the glazing product listed in an early specification. During value engineering, the owner approved a lower-cost storefront system with different U-factor and SHGC values. The window schedule was updated. The COMcheck file and the mechanical load calculations were not.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2ebf51f e-flex e-con-boxed e-con e-parent\" data-id=\"2ebf51f\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8968ff5 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"8968ff5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>At plan review, the examiner compared the schedule to the report and issued a comment on the mismatch. The team re-ran COMcheck, which passed with the new product, then discovered the mechanical engineer&#8217;s cooling loads had been calculated on the original glazing. Equipment selections were rechecked and a revised set was resubmitted. A single product swap touched four documents, and only one of them was updated at the time of the change.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0a0a8bf e-flex e-con-boxed e-con e-parent\" data-id=\"0a0a8bf\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c5a2c3a sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"c5a2c3a\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Expert Insights \/ Tips<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9c5ef29 e-flex e-con-boxed e-con e-parent\" data-id=\"9c5ef29\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-43c94c8 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"43c94c8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Plan reviewers think in tracing, not in totals. Make every COMcheck line traceable to a sheet number.<\/li><li>When a substitution request arrives, ask two questions before approving: does it change a COMcheck input, and does it change a load calculation input.<\/li><li>Roof space is a coordination issue now too. Solar-ready requirements in newer editions compete with rooftop mechanical equipment for the same area, and that conversation belongs at schematic design, not at permit.<\/li><li>Do an internal plan review before submittal using the jurisdiction&#8217;s checklist. It is faster than a formal comment cycle.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1666a86 e-flex e-con-boxed e-con e-parent\" data-id=\"1666a86\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-088086c sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"088086c\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Future Trends<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-7c3194e e-flex e-con-boxed e-con e-parent\" data-id=\"7c3194e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-99eee46 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"99eee46\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>As more states certify to 90.1-2022 and the 2024 IECC, envelope requirements and related items such as on-site renewable provisions and solar-ready zones will reach more jurisdictions. DOE noted that 90.1-2022 adds, for the first time, a minimum prescriptive requirement for on-site renewable energy. The practical result for design teams is more cross-discipline dependency in the permit set, not less. Teams that treat envelope data as a shared model dataset will absorb code changes more easily than teams that rebuild compliance from drawings each time.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a4b4e5b e-flex e-con-boxed e-con e-parent\" data-id=\"a4b4e5b\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1e0c15d sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"1e0c15d\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently Asked Questions \u2753<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1cf35bd e-flex e-con-boxed e-con e-parent\" data-id=\"1cf35bd\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1f95e0f sc_fly_static elementor-widget elementor-widget-n-accordion\" data-id=\"1f95e0f\" data-element_type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3310\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-3310\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Q: Who should own the COMcheck file, the architect or the MEP engineer? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3310\" class=\"elementor-element elementor-element-13f5f0b e-con-full e-flex e-con e-child\" data-id=\"13f5f0b\" data-element_type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3310\" class=\"elementor-element elementor-element-6f76810 e-flex e-con-boxed e-con e-child\" data-id=\"6f76810\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf07f3b sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"bf07f3b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>It varies by firm and contract, but the envelope inputs belong to the architect. The important part is that the MEP engineer uses the same values and the owner of the file is named at kickoff.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3311\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3311\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Q: When should COMcheck be started? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3311\" class=\"elementor-element elementor-element-cd08b3e e-con-full e-flex e-con e-child\" data-id=\"cd08b3e\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-562c1ee sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"562c1ee\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>At design development, once assemblies and glazing are defined, and then re-run at each issue. Building it only at permit stage is the most common source of mismatches.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3312\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3312\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Q: Why do reports get rejected at pre-screen in some cities?  <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3312\" class=\"elementor-element elementor-element-59fe90d e-con-full e-flex e-con e-child\" data-id=\"59fe90d\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7702f6f sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"7702f6f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Some permitting offices screen for completeness before assigning a reviewer. Missing product information, blank fields, or absent plan references can stop a submittal before review begins.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3313\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3313\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Q: Does changing a window product really affect MEP? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3313\" class=\"elementor-element elementor-element-af9e4a2 e-flex e-con-boxed e-con e-child\" data-id=\"af9e4a2\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-baab919 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"baab919\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Yes. Glazing U-factor and SHGC feed cooling and heating load calculations, so a change in either can affect equipment sizing.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3314\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3314\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Q: Which code edition applies to my project?  <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3314\" class=\"elementor-element elementor-element-1891097 e-flex e-con-boxed e-con e-child\" data-id=\"1891097\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ad33fbb sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"ad33fbb\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>That depends on the jurisdiction and the permit date. Confirm with the building department early, and check DOE&#8217;s state code status pages for the current picture.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e8b0841 e-flex e-con-boxed e-con e-parent\" data-id=\"e8b0841\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fea45c3 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"fea45c3\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Conclusion<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0fc2237 e-flex e-con-boxed e-con e-parent\" data-id=\"0fc2237\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-235e25c sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"235e25c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Envelope compliance fails in the handoffs, not in the calculations. A report built late, from drawings that have moved, checked against a model nobody updated, will produce comments no matter how good the design is. The teams that get through plan review cleanly are the ones that treat envelope data as shared, versioned, and traceable, from schematic design to permit.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b96ce10 e-flex e-con-boxed e-con e-parent\" data-id=\"b96ce10\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1dddad3 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"1dddad3\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Call-to-Action <\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-dea7d62 e-flex e-con-boxed e-con e-parent\" data-id=\"dea7d62\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4b46735 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"4b46735\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>If your architectural and MEP packages are produced by different hands, it is worth looking at where the envelope data crosses between them. Talk to eLogicTech about a coordinated architectural and MEP production workflow built around your permit deadlines.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Introduction The COMcheck report is usually the last document built in a commercial permit set, and it is often built by the&hellip;<\/p>\n","protected":false},"author":1,"featured_media":4335,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4316","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog\" \/>\n<meta property=\"og:description\" content=\"Introduction The COMcheck report is usually the last document built in a commercial permit set, and it is often built by the&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ElogictechSolutions\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-06T10:24:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-14T10:40:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1296\" \/>\n\t<meta property=\"og:image:height\" content=\"756\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@elogictechaec\" \/>\n<meta name=\"twitter:site\" content=\"@elogictechaec\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#\\\/schema\\\/person\\\/482b241bde162df7ed9cbf7f77e8d9c7\"},\"headline\":\"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review\",\"datePublished\":\"2026-10-06T10:24:26+00:00\",\"dateModified\":\"2026-10-14T10:40:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/\"},\"wordCount\":2189,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/image-68.jpg\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/\",\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/\",\"name\":\"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/image-68.jpg\",\"datePublished\":\"2026-10-06T10:24:26+00:00\",\"dateModified\":\"2026-10-14T10:40:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/image-68.jpg\",\"contentUrl\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/image-68.jpg\",\"width\":1296,\"height\":756},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/\",\"name\":\"Blog\",\"description\":\"Stay Updated with the Industry Insights |  eLogicTech\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#organization\",\"name\":\"Blog\",\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/logo.png\",\"width\":210,\"height\":60,\"caption\":\"Blog\"},\"image\":{\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ElogictechSolutions\",\"https:\\\/\\\/x.com\\\/elogictechaec\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/#\\\/schema\\\/person\\\/482b241bde162df7ed9cbf7f77e8d9c7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.elogictech.com\\\/blog\"],\"url\":\"https:\\\/\\\/www.elogictech.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/","og_locale":"en_US","og_type":"article","og_title":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog","og_description":"Introduction The COMcheck report is usually the last document built in a commercial permit set, and it is often built by the&hellip;","og_url":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/","og_site_name":"Blog","article_publisher":"https:\/\/www.facebook.com\/ElogictechSolutions","article_published_time":"2026-10-06T10:24:26+00:00","article_modified_time":"2026-10-14T10:40:22+00:00","og_image":[{"width":1296,"height":756,"url":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_creator":"@elogictechaec","twitter_site":"@elogictechaec","twitter_misc":{"Written by":"admin","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#article","isPartOf":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/"},"author":{"name":"admin","@id":"https:\/\/www.elogictech.com\/blog\/#\/schema\/person\/482b241bde162df7ed9cbf7f77e8d9c7"},"headline":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review","datePublished":"2026-10-06T10:24:26+00:00","dateModified":"2026-10-14T10:40:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/"},"wordCount":2189,"commentCount":0,"publisher":{"@id":"https:\/\/www.elogictech.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#primaryimage"},"thumbnailUrl":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg","articleSection":["Blog"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/","url":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/","name":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review - Blog","isPartOf":{"@id":"https:\/\/www.elogictech.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#primaryimage"},"image":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#primaryimage"},"thumbnailUrl":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg","datePublished":"2026-10-06T10:24:26+00:00","dateModified":"2026-10-14T10:40:22+00:00","breadcrumb":{"@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#primaryimage","url":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg","contentUrl":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2026\/10\/image-68.jpg","width":1296,"height":756},{"@type":"BreadcrumbList","@id":"https:\/\/www.elogictech.com\/blog\/building-envelope-modeling-and-comcheck-where-architect-mep-coordination-breaks-down-and-what-it-costs-at-plan-review\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.elogictech.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Building Envelope Modeling and COMcheck: Where Architect-MEP Coordination Breaks Down \u2014 and What It Costs at Plan Review"}]},{"@type":"WebSite","@id":"https:\/\/www.elogictech.com\/blog\/#website","url":"https:\/\/www.elogictech.com\/blog\/","name":"Blog","description":"Stay Updated with the Industry Insights |  eLogicTech","publisher":{"@id":"https:\/\/www.elogictech.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.elogictech.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.elogictech.com\/blog\/#organization","name":"Blog","url":"https:\/\/www.elogictech.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elogictech.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2018\/10\/logo.png","contentUrl":"https:\/\/www.elogictech.com\/blog\/wp-content\/uploads\/2018\/10\/logo.png","width":210,"height":60,"caption":"Blog"},"image":{"@id":"https:\/\/www.elogictech.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ElogictechSolutions","https:\/\/x.com\/elogictechaec"]},{"@type":"Person","@id":"https:\/\/www.elogictech.com\/blog\/#\/schema\/person\/482b241bde162df7ed9cbf7f77e8d9c7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ea077a0638c27e484be710ed54fe4058621797c05250a235a1656d69e9df157d?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.elogictech.com\/blog"],"url":"https:\/\/www.elogictech.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/posts\/4316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/comments?post=4316"}],"version-history":[{"count":22,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/posts\/4316\/revisions"}],"predecessor-version":[{"id":4365,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/posts\/4316\/revisions\/4365"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/media\/4335"}],"wp:attachment":[{"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/media?parent=4316"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/categories?post=4316"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.elogictech.com\/blog\/wp-json\/wp\/v2\/tags?post=4316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}